If Keystone was so damn important how many miles of Keystone was built while Trump was in office
Answer: 1.4 miles on US territory and 93 miles on Canadian territory
How many miles of Keystone pipeline line was built and put into operation while Obama was President?
Answer: 2,687 miles on both US and Canadian territory
In July, a U.S. Supreme Court decision further delayed the Keystone XL project. Taken together, those 94.4 miles are 8% of the 1,210 planned miles, meaning it was nowhere near complete when Biden took action against it.
Answer: 1.4 miles on US territory and 93 miles on Canadian territory
How many miles of Keystone pipeline line was built and put into operation while Obama was President?
Answer: 2,687 miles on both US and Canadian territory
In July, a U.S. Supreme Court decision further delayed the Keystone XL project. Taken together, those 94.4 miles are 8% of the 1,210 planned miles, meaning it was nowhere near complete when Biden took action against it.